Punjab Solar Tubewell Scheme 2026: Subsidy, Eligibility & How to Apply
Punjab gives Rs500,000 to Rs1,000,000 subsidy to convert electric or diesel tubewells to solar (10, 15 or 20 kW). Eligibility, documents, how to apply on cmstp.punjab.gov.pk and ballot status.
Important: PakJobSolution is not a government website. Apply or check status only on the official portal cmstp.punjab.gov.pk or the Agriculture Department helpline 0800-17000 (8 AM to 8 PM).
The CM Punjab Solarization Program for Agri Tubewells gives farmers a fixed subsidy to convert an electric or diesel tubewell to solar: Rs500,000 for a 10 kW system, Rs750,000 for 15 kW and Rs1,000,000 for 20 kW. The first phase covers 8,000 tubewells, chosen by ballot. You must own at least one acre of farmland in Punjab and apply in the same district. The farmer pays the rest of the system cost.
What is the Punjab solar tubewell scheme?
It is a Punjab Agriculture Department programme that helps farmers replace diesel or grid-electric tubewells with solar-powered ones. The government pays a fixed subsidy per system size, and the farmer pays the balance. Chief Minister Maryam Nawaz launched it with the first ballot on 1 February 2025.
Subsidy amounts
| Solar system size | Government subsidy |
|---|---|
| 10 kW | Rs500,000 |
| 15 kW | Rs750,000 |
| 20 kW | Rs1,000,000 |
The subsidy is a fixed amount, not a percentage. Some websites claim the government pays "80%" or "100%" of the cost. The official programme page lists the fixed amounts above. What share of your system this covers depends on the price of the system you install.
Who is eligible?
- A resident of Punjab who owns at least one acre of agricultural land in Punjab.
- The land must be in the same district where you apply.
- Only one system per family.
- Both electric and diesel tubewells qualify.
- For electric tubewells: the connection must be in your name, on a three-phase supply, installed on or before 30 October 2024, with the last bill paid. Defaulters are excluded.
- The system must be 10, 15 or 20 kW.
Documents required
- Copy of a valid CNIC
- Fard-e-Malakiat (land ownership record)
- For an electric tubewell: the last paid electricity bill of the tubewell connection
How to apply and check status
- Go to the official portal cmstp.punjab.gov.pk.
- Check whether an application window is open. The portal also has the application form.
- Enter your CNIC, mobile number, tubewell type and motor capacity, and the system size you need.
- Upload or attach your documents.
- Selected farmers are picked by ballot. Check the result on the same portal with your CNIC.
Application windows have been extended several times. Before you apply, confirm on the portal or the helpline 0800-17000 that applications are open. We will update this page when a new phase is announced.
Which size do you need: 10, 15 or 20 kW?
The solar system must be big enough to run your motor in daylight. As a rough rule, installers size the solar array above the motor's power, because panels give less than their rated output in heat and dust. Ask your installer to size the system from your motor's nameplate (in kW or HP), your well depth and how many hours a day you need to pump. One horsepower is about 0.75 kW.
Delays and what to expect
Hundreds of thousands of farmers applied for just 8,000 subsidised systems in the first phase, and news reports have described delays in balloting, vendor selection and installation. If you were selected, keep your documents ready and use only the official portal and helpline for updates.
Frequently asked questions
How much subsidy do I get for a solar tubewell in Punjab?
Rs500,000 for 10 kW, Rs750,000 for 15 kW and Rs1,000,000 for 20 kW, according to the official programme page.
Can a diesel tubewell owner apply?
Yes. Both diesel and electric tubewells are eligible.
Do I need to own the land?
Yes. You must own at least one acre of agricultural land in the district where you apply, proven by Fard-e-Malakiat.
Tubewell solar scheme ki qurandazi ka result kaise check karein?
Official portal cmstp.punjab.gov.pk par apna CNIC daal kar result check karein, ya helpline 0800-17000 par call karein.
Related guides: Households in Punjab can check the CM Punjab free solar panel scheme. Before you sell extra power to the grid, read net billing in Pakistan 2026.
Sources
- Government of Punjab: CM Solarization Program for Agri Tubewells
- Dunya News: first ballot, 1 February 2025
- Business Recorder: 533,000 applications received
- Dawn: delays in implementation
Last checked: 19 November 2026.
Discussion 0
No comments yet. Be the first to share your thoughts!
Leave a Comment