New Electricity Connection Apply Online 2026: ENC Portal, Documents & Demand Notice Fee
Apply for a new electricity meter on the ENC portal: documents, Tracking ID, demand notice parts, single vs three phase, timelines and scams to avoid.
For any ex-WAPDA DISCO (LESCO, MEPCO, FESCO, IESCO, GEPCO, PESCO, HESCO, SEPCO, QESCO), apply for a new meter online at the ENC portal (enc.com.pk). You get a Tracking ID; after a site survey the DISCO issues a demand notice that you pay at the designated bank. The fee depends on load, phase and line extension. For a single-phase home connection, reported LESCO demand notices have risen to about Rs21,000 after the switch to AMI smart meters; only the security deposit part is refundable.
Not an official DISCO website. pakjobsolution.com is an independent guide. Use only official DISCO/PITC sites or your bank app to view and pay bills.
Documents required
- Applicant's CNIC.
- Proof of ownership (registry/fard/allotment) or tenancy agreement with the owner's consent.
- Copy of a neighbour's electricity bill (for the reference area).
- Wiring contractor's test report.
- Recent photograph and site plan (if asked).
Step by step
- Open enc.com.pk, select your DISCO and "New Connection".
- Choose domestic/commercial, single or three phase, and load (kW).
- Upload documents and submit; note the Tracking ID.
- Site survey by line staff.
- Print the demand notice from ENC with your Tracking ID and pay at the specified bank branch.
- Upload the paid receipt and wait for meter installation.
What's in the demand notice?
| Part | Refundable? |
|---|---|
| Security deposit | Yes (on disconnection) |
| Meter cost (AMI) | No |
| Service/capital cost, line material | No |
Single vs three phase
- Single phase: most homes; up to about 5 kW load. Cheaper demand notice.
- Three phase: large homes with several ACs or above 5 kW; much higher demand notice. Needed for many net-billing solar systems above a certain size; see net billing.
Timelines
NEPRA's Consumer Service Manual sets maximum times for each stage. In practice, domestic connections take from about two weeks to two months depending on material and line extension. Track progress on ENC with your Tracking ID.
Avoid these scams
- Paying "urgent fees" to line staff outside the demand notice.
- Agents selling demand notices; print it yourself from ENC.
- Fake ENC look-alike sites; check the address.
FAQs
How do I apply for a new meter online?
On enc.com.pk; keep your Tracking ID.
Naye meter ki fees kitni hai?
Load aur area par munhasir hai; LESCO single phase ke liye taqreeban Rs21,000 report hui hai.
Can a tenant apply?
Yes, with the owner's consent and tenancy agreement.
Can I pay the demand notice online?
Usually it must be paid at the designated bank shown on the notice.
Discussion 0
No comments yet. Be the first to share your thoughts!
Leave a Comment